NEWS
itimat steam generators used in Astana 2017 project
Project Name : ASTANA 2017 PROJECT

Total Steam Output : 1,000 kg/h

Operating Pressure : 6 bar

Design Pressure : 7 bar

Test Pressure : 10.5 bar

Efficiency : %92 without economiser

User friendly Boiler Management System

Equipment: Steam Generator, Stack, Hot Water Cylinder, Fuel Tank, Condense Tank and Water Softoner, Water Tank and hydrofor.
© Copyright 2024 - All Rights Reserved İkitelli Organize Sanayii Bölgesi Pik Dökümcüler Sanayi Sitesi A-5 Blok No:15 Başakşehir / İstanbul (Merkez) Telephone : 0090 (212) 485 1 993 - E-Mail : TÜRKÇE - ENGLISH - RUSSIAN Design : GWT